Production Services
Intervention work on producing wells — braided line and fishing, logging, pipe recovery, and plug services — across the Haynesville, South Texas, Permian, and Marcellus.
What we offer
Four service lines for wells already on production.
Braided Line & Fishing
Recovery for stuck tools, parted wireline, and junk left in the wellbore.
Evaluation
Production and diagnostic logging to support production decision making, including cement evaluation.
Pipe Recovery
Free-point to locate where the string is stuck, back-off or cutter operations to separate it where planned.
Plug Services
Plug setting and retrieval, including retrievable bridge plugs for zone isolation.
Set on electric line. Pull with braided line. Same truck, same crew.
When the set and the recovery run on separate units, the job carries a second rig-up, a second mobilization, and the scheduling gap between them. GR offers both from the same unit with the same crew, so the well goes from isolated to recovered without the wait.


The job is visible while it's happening
Production Services jobs use the PHIRE System, built by Wellmatics. Depth, tension, and tool response are recorded and visible in real time, so calls get made against data instead of against a best guess — and the record is there afterward.
Live diagnostics
Real-time data streamed directly to operator.
Smarter decisions
Adjust on the fly, with zero guesswork, directly with field operations.
Where we work
Production Services crews work across four basins.
Haynesville
South Texas
Permian
Marcellus
Tell us what's stuck.
Send us the well and the problem. We'll tell you what it takes to get it back online.
