Production Services

Intervention work on producing wells — braided line and fishing, logging, pipe recovery, and plug services — across the Haynesville, South Texas, Permian, and Marcellus.

What we offer

Four service lines for wells already on production.

Braided Line & Fishing

Recovery for stuck tools, parted wireline, and junk left in the wellbore.

Evaluation

Production and diagnostic logging to support production decision making, including cement evaluation.

Pipe Recovery

Free-point to locate where the string is stuck, back-off or cutter operations to separate it where planned.

Plug Services

Plug setting and retrieval, including retrievable bridge plugs for zone isolation.

One truck. One crew.

Set on electric line. Pull with braided line. Same truck, same crew.

When the set and the recovery run on separate units, the job carries a second rig-up, a second mobilization, and the scheduling gap between them. GR offers both from the same unit with the same crew, so the well goes from isolated to recovered without the wait.

GR wireline unit with mast rigged up on a well pad
GR technician preparing tool components in the shop
PHIRE System

The job is visible while it's happening

Production Services jobs use the PHIRE System, built by Wellmatics. Depth, tension, and tool response are recorded and visible in real time, so calls get made against data instead of against a best guess — and the record is there afterward.

Live diagnostics

Real-time data streamed directly to operator.

Smarter decisions

Adjust on the fly, with zero guesswork, directly with field operations.

Where we work

Production Services crews work across four basins.

Haynesville

South Texas

Permian

Marcellus

Tell us what's stuck.

Send us the well and the problem. We'll tell you what it takes to get it back online.